News for hackers. Stuff that matters.
Re:Mexico building rail rival as water shortages drain Panam... by dave333 on Monday January 15, 2024 @05:10AM (#38999135)
Based on the diagram of the locks and water saving basins at https://en.wikipedia.org/wiki/Panama_Canal_expansion_project... they could have a second basin D at the same level as basin C. They would pump the fresh water in C that has come down the lock chain back up into the lake. They could pump sea water into D that would be used to fill the bottom lock when a ship is acsending the chain. Then the sea water in the bottom lock would be drained to the sea when a ship descends.

There are no comments on this comment yet.