All the "nuclear renaissance" nuclear builds aside from Vogtle 3/4 were cancelled because the utilities realized the alternatives were much better economically. V. C. Summer was cancelled after dropping $9B on it. Even with that sunk cost, it still wasn't worth completing.
What happened between back then and now is two (well, three) things: fracking crashed the price of natural gas, demand didn't increase as much as utilities said it would, and then (later, after fracking) renewables also became much MUCH cheaper. One can excuse the nuclear industry for not seeing this would happen (or perhaps for not wanting to see that it would happen), but that doesn't change the fact that it did happen, and that the nuclear builds turned out to be economically unjustifiable.
Things got so bad for nuclear we were seeing already completed NPPs being shut down because they couldn't even make an operating profit! The other reactor at TMI had been cash flow negative for the last six years it was in operation, for example. In that sort of environment, building a new NPP (which would also have to amortized construction and financing costs) would be totally out of the question economically.
Fact 1. People in Georgia pay about 1.7 cent per kwh less than the national average ($0.110 vs $0.127 [1])
Fact 2. People in Georgia paid about 1 cent per kwh less than the national average 20 years ago ($0.077 vs $0.087, [2])
Are you disputing these facts?