Re:The Piccadilly line’s new air conditioned trains by arethuza on Tuesday November 21, 2023 @10:58AM (#38365413)
"you just copy/paste"

Aren't we talking about physical signalling kit - no copying and pasting? 272 stations and ~400km of track - a lot of which is pretty difficult to access?

Re:The Piccadilly line’s new air conditioned trains by IshKebab on Tuesday November 21, 2023 @04:59PM (#38370933)
He obviously meant copy and pasting the design. What did you think he meant?
Re:The Piccadilly line’s new air conditioned trains by arethuza on Thursday November 23, 2023 @04:50AM (#38391117)
I have no idea - that's why I was asking. I've been responsible for installing systems that had the same "design" into multiple physical locations - hundreds of physical devices at each location.

Having a common design does help but it doesn't help that much as most of the problems are with the physical realities of each location - and what I did was much simpler and less critical than signalling.