News for hackers. Stuff that matters.
Re:The Piccadilly line’s new air conditioned trains by SideburnsOfDoom on Tuesday November 21, 2023 @08:47AM (#38363522)
The ground around the deep tunnels already is a heat reservoir, over decades it heated up. https://en.wikipedia.org/wiki/London_Underground_cooling
Re:The Piccadilly line’s new air conditioned trains by t43562 on Tuesday November 21, 2023 @10:51AM (#38365295)
That is interesting because it suggests that we could grab some of that heat in winter and pump it into houses and businesses on the surface. In the long term that would help summer heat in the tube to be less of a problem.
Re:The Piccadilly line’s new air conditioned trains by SideburnsOfDoom on Tuesday November 21, 2023 @02:12PM (#38368442)
The idea of "Grab that heat and pump it into businesses and apartment blocks above" requires actual physical infrastructure, and so suffers from the same issues as drilling new ventilation shafts to simply vent waste hot air into the air above: It's a densely inhabited area, and has been for a long time. It is neither cheap nor easy to find room for those ventilation shafts, both below and above ground.

If venting was easy, it would have been done long ago, well before the idea of re-using waste heat rather than just venting it was a thing.

Re:The Piccadilly line’s new air conditioned trains by ProfessorLayton on Tuesday November 21, 2023 @04:36PM (#38370606)
They don't have to vent air though, for the same reasons we don't need to vent air for geothermal heat pumps. It doesn't seem all that crazy to drill minimally for some coolant lines and run a mini-split style heat pump system into the hottest stations.

I'm not saying this is easy per se, but far from impossible, or impossibly expensive.

Re:The Piccadilly line’s new air conditioned trains by gsnedders on Tuesday November 21, 2023 @05:06PM (#38371034)
This has been done to some degree at Green Park station, which still very much is quite warm in places, for ~£9M about a decade ago.

But when TfL has had its budget slashed, and such projects are competing for financing with other projects with more direct operational benefit… it's hard to justify. And it's still not necessarily easy to drill at all!

Re:The Piccadilly line’s new air conditioned trains by ProfessorLayton on Tuesday November 21, 2023 @05:31PM (#38371373)
Agreed that drilling isn't easy, but this does seem more like a budgetary and political issue than an engineering challenge.

Not much (if any) drilling may even be necessary, as there's also the option of running coolant lines directly into the train tunnels. Existing water infrastructure could also be used as coolant — especially if it's otherwise sitting idle for a fire that hopefully never happens!

Re:The Piccadilly line’s new air conditioned trains by SideburnsOfDoom on Wednesday November 22, 2023 @06:55AM (#38378027)
> seem more like a budgetary and political issue than an engineering challenge.

Science is about proving that something can be done at all.

Engineering is about taking that result and productionising it - doing it reliably, safely, effectively and on a budget. On the right site, even if that's in a busy city. "time and budget issues" are part of any engineering challenge. Very few engineering projects are "Money no object".

An also, there currently isn't the political will in the UK to invest in expensive infrastructure and engineering projects. London actually gets more investment than the hinterlands. See https://www.reuters.com/world/uk/whats-happening-hs2-britain...

Re:The Piccadilly line’s new air conditioned trains by ProfessorLayton on Wednesday November 22, 2023 @02:52PM (#38384224)
It seems like we're in agreement here? Geothermal heat pumps aren't particularly novel, so it doesn't seem like engineering a solution is the blocker here. It's mainly politics.
Re:The Piccadilly line’s new air conditioned trains by SideburnsOfDoom on Thursday November 23, 2023 @12:16PM (#38395007)
Exactly, budget is an engineering concern, and in this case it's nigh impossible to engineer a solution, given the space and budgetary constraints.
Re:The Piccadilly line’s new air conditioned trains by ProfessorLayton on Friday November 24, 2023 @02:55PM (#38407547)
The budgetary constraints are purely political though. Stuff like this has been engineered before at a reasonable cost (eg the Green Park station for 9M according to a poster above). So while yes things have to be engineered to a cost, it’s clearly not some impossibility high number.