Re:Nuclear Energy Project in Idaho Is Canceled by briffle on Thursday November 09, 2023 @12:37PM (#38208106)
These are to be mass produced, and shipped to the site. So really, the first few will have cost overruns and delays, but then they should be able to re-use all the tooling, processes, transportation equipment, etc, to get the rest going.
Re:Nuclear Energy Project in Idaho Is Canceled by petre on Thursday November 09, 2023 @05:41PM (#38212427)
Only the reactor vessel which is probably one of the most expensive parts of the entire project, along with the turbine.

https://ifp.org/nuclear-power-plant-construction-costs/