This ends up coupled with the fact that practitioners (of anything productive) tend to think in terms of 50-ish percentile estimates (i.e., there's a 50% chance this project is done in this amount of time), whereas business people care about 90th-99th percentile estimates. In software, the difference between between a 50th percentile estimate and 90th percentile estimate can be more than an order of magnitude in time spent.
If your shit is breaking so often it's affecting your willingness to estimate, that's a you problem.
I'm driving to another state for the thanksgiving holidays, and I have an estimate for how long that will take. Is it possible when I walk out to my car that the battery died the night before? sure. Am I going to factor such an unlikely event into my estimate? no. Does that imply it's impossible for me to accurately estimate how long that trip is going to take? No it doesn't.
Only in software could someone be using a tool that constantly doesn't work and they never consider replacing it or fixing it. Imagine if a carpenter showed up to your house with a hammer whose handle fell off once or twice an hour but they expected you to pay them for the loss of productivity rather than purchasing a hammer whose handle doesn't fall off.
That produces a much fatter tail distribution, because you're doing someone that no one has ever done before, and thus no one knows exactly how long it's going to take.
odd, because my experience is that your CI/CD pipeline does the exact same thing repeatedly.
Perhaps the answer to your confusion about my experience is that I don't suffer tools that hamper my productivity.
Put it another way.
I ran a raiding guild for several years and about halfway through that stint I recruited a player that raised the bar for what I thought was possible. Perhaps you need your bar raised.
Both have been documented to have happened, yet somehow you didn't seem to think that should be taken into account when considering estimates for cooking and pissing.
If your shit is breaking so often you're afraid to give an estimate, that's a you problem.
And yes, we had an internal team that w/i the last 6 months couldn't go a week without a deployment problem. Ask me why they no longer have that issue.
What if, while cooking dinner, a meteor crashes in my kitchen and so my estimate of 30 minutes to cook dinner turns out to be incorrect? That _obviously_ means the conclusion is that it's impossible to accurately estimate how long it takes to cook that dish so we should never do so.
There has to be a name for the type of reply your post represents.