1. Process controls: What do we do when this breaks for any reason.
2. Engineering controls: What can we do to keep this from breaking in the first place?
Both of them seem to be somewhat essential for a truly safe system.
1. You could know the solution, but it would be too heavy.
2. You could know the solution, but it would include more parts, each of which would need the same process on it, and the process might fail the same way
3. You miss something and it fails anyway, so your "what if this fails" path better be well rehearsed and executed.
Real engineering is facing the tradeoffs head on, not hand waving them away.
The process controls do however independently make things safe.
The reason for this is that there are 'unknown unknowns'—we accept that our knowledge and skills are imperfect, and there may be failures that occur which could have been eliminated with the proper engineering controls, but we, as imperfect beings and organisations, did not implement the engineering controls because we did not identify this possible failure mode.
There are also known errors, where the cost of implementing engineering controls may simply outweigh the benefits when adequate process controls are in place.
https://en.m.wikipedia.org/wiki/Hierarchy_of_hazard_controls
I mention this only because the Daily Mail headline pissed me off with it's usual bullshit foreigner fear mongering crap.
The real safety feature is the 4 hour lead time before manual processing becomes necessary.
One of the key safety controls in aviation is “if this breaks for any reason, what do we do”, not so much “how do we stop this breaking in the first place”.