> (1) the facility requires a total load of more than 75 megawatts; and
Then I register with ERCOT... and profit. They seem to have passed a few bothersome "bills" to thwart our attempts at being a giant resistor though. Also, so they don't seem to specify any efficiency rating for the whole endeavor. Perhaps I can literally install a giant power resistor + a few GPUs, claim 75 MW, turn it all off and then head to the bank?
> (1) the facility requires a total load of more than 75 megawatts; and
Then I register with ERCOT... and profit. They seem to have passed a few bothersome "bills" to thwart our attempts at being a giant resistor though. Also, so they don't seem to specify any efficiency rating for the whole endeavor. Perhaps I can literally install a giant power resistor + a few GPUs, claim 75 MW, turn it all off and then head to the bank?