But you're right that you can basically get a permit for nearly anything if your pockets are deep enough and the restrictions are often arbitrary. That's why I mentioned fast-tracking: the area we built in had fairly strict requirements compared to houses only a few blocks away and any deviation would have required a costly and lengthy approval process (measured in months rather than weeks) so staying within the requirements was primarily a financial decision.
This is corruption. The process of approval should not be lengthy of costly.
Verifiably false.
>everything is checked in order
Also verifiably false.
>The option to pay for a faster approval would be corruption
Is on the table in many jurisdictions.
That said, the processing time is probably more costly than the direct expenses because having to wait longer means you likely already pay a part of the mortage rate (most banks have start-up costs on these loans and you are generally expected to secure the loan before you have the approval). The entire process is expensive enough for the actual fees not to be a meaningful issue.
Not all houses need to meet the form based codes. If you want to do something different then you need a professional engineer to stamp and approve the plans - once stamped the town needs no more input.
Apartments and commercial buildings start to get more complex (but even then many meet form based codes as it is cheaper than calculating out all the stresses). However again professional engineer needs to approve the plans not the town.