Re:Wendelstein 7-X: Gigajoule energy turnover generated for ...
by MichaelZuo on Saturday August 12, 2023 @11:51AM
(#37101411)
It does seem to hinge on the cost of fuel, I have some doubts about whether they can secure a fuel supply so cheap as to skip out on that extra 4 MW, even after factoring in the cost of a small steam turbine installation.
Re:Wendelstein 7-X: Gigajoule energy turnover generated for ...
by DennisP on Saturday August 12, 2023 @01:58PM
(#37102629)
Deuterium costs several thousand dollars/kilogram. But even though it is just one part in several thousand of the hydrogen in water, there's enough deuterium in your morning shower to provide all your energy needs for a year.[1] Cost of deuterium is definitely insignificant.
Helion's other fuel is helium-3 which they'll make themselves by fusing deuterium. So the helium-3 cost will directly depend on the capital cost of the reactor producing it.
With fuel costs insignificant, your cost per kWh is mainly capital cost. Let's say it's all capital just to keep it simple. I don't know how much the input energy will be but if your choice is between, say, generating net energy of 50MW without a turbine or 54MW with a turbine, then you would skip the turbine if it adds more than 8% to the capital cost. I suspect Helion has done this calculation in detail.