Re:Throw away your first draft of your code
by Tokumei-no-hito on Sunday August 06, 2023 @10:42PM
(#37029418)
I feel this. What I do now is increase the points of the PoC (real estimated PoC time + optimization).
I get the PoC down asap then as soon as it’s proven (privately to myself) I move onto optimizing. If it fails then I communicate early to discuss a change of scope.
Assuming it succeeds, by the time I present it I have already done significant work making it production ready. So to request an extra 10-25% time to “smooth out the edges” goes over easy after the demo.
In reality I end up with 50-75% time to get it prod ready. The rest is QA + prod bug fixes to take it over the (practically scoped) finish line.
I get the PoC down asap then as soon as it’s proven (privately to myself) I move onto optimizing. If it fails then I communicate early to discuss a change of scope.
Assuming it succeeds, by the time I present it I have already done significant work making it production ready. So to request an extra 10-25% time to “smooth out the edges” goes over easy after the demo.
In reality I end up with 50-75% time to get it prod ready. The rest is QA + prod bug fixes to take it over the (practically scoped) finish line.