>2. A portion of the operation will be conducted inside an experimental submersible vessel. The experimental submersible vessel has not been approved or certified by any regulatory body and may be constructed of materials that have not been widely used in human occupied submersibles.
If you don't, you knew and accepted the risk.
Risk = probability x severity.
From that link, they characterized the severity (death) but not the probability. Saying "you may die" is different from saying "your have a 50% chance of dying." My guess is nobody had a good estimate for the probability so nobody could have accurately communicated the risk.
I don't know. This implies a high probability to me.
E.g., one of the problems with the Shuttle disasters is that the implied risk was understood differently at various levels. (Making numbers up here but directionally accurate) After the fact, managers thought there was a 1/1000 risk of catastrophic failure while engineers put it a 1/172.
>2. A portion of the operation will be conducted inside an experimental submersible vessel. The experimental submersible vessel has not been approved or certified by any regulatory body and may be constructed of materials that have not been widely used in human occupied submersibles.
Edit: I mean just read the waiver: https://nypost.com/2023/06/23/read-the-death-waiver-doomed-t...
It speaks for itself.