Re:Annoying A/B testing mistakes every engineer should know
by keithwinstein on Friday June 16, 2023 @11:46AM
(#36358605)
FWIW, the arithmetic in that example also has a glitch. For the "Mobile" "Control" case, 100/3000 is about 3% rather than 10%.
[ Parent
| on HN ]
There are no comments on this comment yet.