A big part of the high cost of the LWR is the cost of the steam turbine and associated heat exchangers (a typical PWR has several of those, each of which is as big as the reactor vessel) These very large systems inflate the balance of system costs such as the size of both the confinement and auxillary buildings.
It's no accident that they stopped building coal burning power plants at the same time they stopped building nuclear plants. Neither one could compete with the low capital cost of gas turbine power plants fueled with methane.
Old literature expected that HTGR power plants with steam turbines might be able to beat the LWR in economics, that fast breeder reactors would be more fuel efficient but have higher capital costs. Today there is some expectation that a fast reactor with a closed cycle gas turbine could undercut the capital cost of an LWR. Now that kind of gas turbine is not a bird in the hand and will take some development, but the potential reward is huge... Such a turbine would almost fit in the employee break room of the turbine house of an LWR.
https://www.eia.gov/todayinenergy/detail.php?id=30812
The bad news is that coal fired power can be cheaper than gas fired power when gas prices are high. If it were just about the cost of steam equipment, we would have seen a similar burst of nuclear reactors starting to operate in the US around 2010. Nuclear power plants are sadly more expensive to build and operate than coal plants.
The good news is that falling costs for renewables and storage make it very unlikely that the US will build any more coal-fired plants on economic grounds.
[1] https://www.forbes.com/sites/energyinnovation/2023/01/30/99-...
No there isn't. Check your figures. Breeder reactors literally cost twice as much as light water reactors of comparable power.
If you are working at higher temperatures with printed circuit heat exchangers the whole thing is dramatically smaller.
Make it profitable, and you can have all the breeder reactors you want.