Re:$22B project to provide 8% of UK energy via undersea cabl...
by londons_explore on Friday March 10, 2023 @06:16AM
(#35093005)
I think building new subsea power transmission is cheaper per mile than building over land.
If you need to upgrade most of the links along the way, then building the longest possible cable at sea makes sense.
There might also be plans to tap off this cable to feed into portugal, spain, france and ireland along the way - that allows the cable to also take the role of some of the local transmission grid
If you need to upgrade most of the links along the way, then building the longest possible cable at sea makes sense.
There might also be plans to tap off this cable to feed into portugal, spain, france and ireland along the way - that allows the cable to also take the role of some of the local transmission grid