That wasn't the original hope -- formerly, they hoped nuclear plants would be cheap and plentiful. My understanding is that "too cheap to meter" just refers to a flat rate -- why bother measuring (especially before modern times, back when that required people visiting meters in person), when you can charge a flat rate? But that clearly was extremely optimistic.
Last time I checked, France's nuclear power stations were keeping the lights on in Europe while Germany scrambles to start up coal plants.
My argument isn't that nuclear doesn't work as a technology -- it obviously produces power. My argument is that building nuclear is not competitive, and that's why nobody is building any.
If you already have a working power plant obviously it can and should be used. Somebody already footed the bill for that one, so that problem is solved for that particular plant. But that has nothing to do with whether building more is a good idea.
It clearly is, if France is selling nuclear power to the rest of Europe.
Nobody is doing it yet because nobody is even close to having too much solar or wind at this point. But that's still likely cheaper in the end.
> And yes, I'm angry, because empirically, on the very grid I use, that is exactly what has happened. We're paying, not the "extortionate" $100 or so nuclear promised, but over $500, because something needs to keep the lights on at moments not convenient for the intermittence.
Nuclear promised power too cheap to meter. That's never materialized. Nuclear promises many things, but so far shows no signs of fulfilling them.
Eg, Hinkley Point C in the UK is infamous for that it's already economically nonsensical and can only exist because the government guaranteed a subsidy. It's already not competitive with modern renewables. That's unlikely to improve in the future.