Re:The UK is wasting a lot of wind power
by kwhitefoot on Friday January 13, 2023 @05:53AM
(#34366165)
The North Sea Link between Norway and the UK is already up and running and has a capacity of 1.4 GW. It is currently (10:53 UTC) supplying 3% of the UK load.
See https://gridwatch.templar.co.uk/