This is only true in high cost states.
In most states, it's 10-15 a ft plus some minimum cost that is like 1500 bucks for trenching setup. Maybe 15-20 in the worst case.
To redo my service to single phase 800 amps, which required a new transformer on a pole, new commercial panel, 100 feet of large underground drop (parallel MCM 600), etc, georgia power + electrician total cost was 10k.
If i had wanted to drag 3 phase power to my shop, which was a mile away, they would charge 10 bucks a foot, total cost 55k.
(I convert the large single phase instead with a digital 3-phase converter)
PGE/California electricians is particularly horrible about costing - i've seen combined costs (IE between PGE + electrician) of like 15k for panel upgrades that require 10 feet of trenching
To redo my service to single phase 800 amps, which required a new transformer on a pole, new commercial panel, 100 feet of large underground drop (parallel MCM 600), etc, georgia power + electrician total cost was 10k.
If i had wanted to drag 3 phase power to my shop, which was a mile away, they would charge 10 bucks a foot, total cost 55k.
(I convert the large single phase instead with a digital 3-phase converter)
PGE/California electricians is particularly horrible about costing - i've seen combined costs (IE between PGE + electrician) of like 15k for panel upgrades that require 10 feet of trenching