Re:First LNG tanker arrives at Germany's new floating terminal
by selectodude on Tuesday January 03, 2023 @12:09PM
(#34234262)
https://www.wsj.com/articles/natural-gas-terminal-engineerin...
Doing anything like that in nine months is impressive. I haven't the faintest idea why anybody would say otherwise.
Germany already operates about 40,000 km of natural gas pipeline. This was a 26km extension in a flat and rural/industrial area. There was no engineering challenge here that they hadn't already pulled off hundreds of times before.