Re:We need more water than rain can provide: refilling river...
by Aloisius on Sunday November 20, 2022 @04:22PM
(#33685470)
Mmm. That’s not an order of magnitude reduction in operating costs.
185,022 m^3/day (150 acre-feet) for $50 million/year is about $0.74/cubic meter.
624,000 m^3/day for $150 million/year is about $0.65/cubic meter.
Re:We need more water than rain can provide: refilling river...
by credit_guy on Sunday November 20, 2022 @07:14PM
(#33687068)
On the other hand if you look at the amortized capital cost (and you use a 40 year lifetime), it comes to 37 cents/m3 for Carlsbad and 4.4 cents/m3 for the Israeli desal plant.
Israel built a 624000 m^3/day desalination plant for about $400M in 2013. It costs about $150M to operate per year, most of it probably from electricity consumption
So you already have an order of magnitude reduction in cost
Build 10 of them should reduce building cost even more per plant
https://en.wikipedia.org/wiki/Desalination_by_country#Israel