News for hackers. Stuff that matters.
Re:Boeing Needs an Act of Congress or Something Worse to Get... by andrewia on Tuesday November 01, 2022 @04:05PM (#33426743)
https://aviation.stackexchange.com/questions/71500/why-wasnt...

TL;DR that adds engineering complexity and/or would trigger redesigns of other components. The MAX 8 was supposed to be an economical refresh - a stopgap until the Y1/"New Midsize Airplane" was ready. (The sales/economic failure of the Y1 "787 Dreamliner" means the Y1 project is paused while Boeing waits for next generation technology to become available. https://en.wikipedia.org/wiki/Boeing_Yellowstone_Project )

Re:Boeing Needs an Act of Congress or Something Worse to Get... by theYipster on Tuesday November 01, 2022 @04:38PM (#33427152)
The economic troubles of the 787 have nothing to do with the technology applied. It’s due to how Boeing managed the program.

The A350 employs the same technology and is an economic success.

Re:Boeing Needs an Act of Congress or Something Worse to Get... by fmajid on Tuesday November 01, 2022 @09:51PM (#33430536)
Here's a scathing paper by a Boeing engineer on how the Dreamliner project's emphasis on outsourcing was an utter fiasco:

https://s3-us-west-1.amazonaws.com/ziggyworks/coolstuff/Boei...