Re:The first Gen III+ Nuclear plant begins fuel loading by concordDance on Saturday October 15, 2022 @05:26AM (#33213211)
I'm disappointed that paper contains no cost estimates. Those are the key thing with energy storage.
Re:The first Gen III+ Nuclear plant begins fuel loading by leetnewb on Saturday October 15, 2022 @07:09AM (#33213750)
Here is a framework for government backed research into the topic: https://www.energy.gov/energy-storage-grand-challenge/articl...
Re:The first Gen III+ Nuclear plant begins fuel loading by pfdietz on Saturday October 15, 2022 @07:52AM (#33214005)
The paper does contain (rough) cost estimates, specifically the cost per unit of energy storage (about $13/kWh) and the cost per unit of power (from $0.20-0.27/W depending on the choice of gas.) See section V, "Cost".

I'm not impressed with the costing methodology used, but it's probably at least in the ballpark.