Global power transfer (~2e7 meters) with current standard HVDC cables would lose 64%, which is still worth doing.
The cables are designed for crossing relatively small bodies of water such as the Mediterranean or the North Sea, and can be tweaked for more efficiency if the goal is to cross the Pacific Ocean, but even without that, it would still work.
The cables are designed for crossing relatively small bodies of water such as the Mediterranean or the North Sea, and can be tweaked for more efficiency if the goal is to cross the Pacific Ocean, but even without that, it would still work.