However for the "renewables can be base load" requirement it is completely impractical because of simple back of the envelope calculations. Suddenly you need multiple TWs of wind generation capability in every spot where it might be windy when calm elsewhere, and you need enough transmission to get TWs of power out from any random location within the EU. This is pipe dream territory.
What I don't know is how long such a cable would last, which matters for total lifetime cost. But construction cost at current prices is on the order of a few trillion, which sure, is loads, but that's for a genuinely global infrastructure project that essentially replaces the multi trillion dollar per year fossil electricity industry.
Biggest problem is probably the geopolitics.
Why do you regard HVDC within Europe as impractical? Sure it would take a while, but there's already a grid. This is certainly achievable in my lifetime even without any interesting new tech like better superconductors or automation.