> in theory 3 space shuttles could deliver ~90 large warheads or up to 900 smaller warheads.
In practicality, all three shuttle launch facilities could not be used simultaneously. In fact, the two actually ever used could not have been used simultaneously. And space shuttles could not have been kept at standby, their launch sequence even in an emergency could never be reduced below 72 hours, and even that with tremendous difficulty.And even if you could get three shuttles airborne at once, where would you land them? Also, I'm not sure if the Vandenburg launch could land after a single orbit, I think that the Florida launches would land a white sands.
> Space Shuttles would also have the ability to identify hard to find targets such as mobile ICBM launchers.
Space shuttles overflying the Soviet Union on a polar trajectory had no ability to maneuver, they had to fly a very specific trajectory to make the landing site. And no way an orbital vehicle could identify a target on the ground and alter its inclination to overfly it on that orbit. That would require both enormous Delta-V and high lateral G loads. Then they'd have to readjust the inclination to land.Regardless, ICBM's would probably be more efficient way to do it.
However, I am looking at the Wikipedia list of runways in service today. I'm not about to embark on looking at historical data.
The core shuttle design to have rocket engines on the orbiter makes substantially more sense if there was at one point a planned orbital delta-v component. Orbital delta-v really only makes sense for military applications involving satellite capture/servicing or nuclear strike. As all of these can be better done with missiles/robots, there isn't much advantage in a space shuttle except for the case where the payload must be returned from orbit. On a polar trajectory the only use cases where this would make sense are spy satellite returns or weapons missions. Replacing the spy satellite entirely is obviously cheaper than returning and refurbishing it - which leaves a weapons use case which was likely discarded sometime late in the program when it was determined to be logistically infeasible or difficult to pull off.
Yes, most (maybe all) shuttle rollouts were less than the 10000 length of the Machrihanish runway, but that's really cutting it close. SLF Florida is 15000 feet. But I guess if the situation is so bad that the shuttle needs to come down outside the US, it's probably not going to be used again so why not mow the grass at the end of the runway.
The idea of using shuttles to manage or deliver a nuclear deterrent/first strike capability in space was probably considered at some point during its development. If there was one reason to scratch this idea, it would be that launching a nuclear shuttle would have been highly auspicious - and likely treated as the equivalent of an ICBM launch. It's highly unlikely that permanent orbital munitions would be tolerated either.