News for hackers. Stuff that matters.
Re:Just another Apollo? Part two (2005) by Teever on Tuesday June 14, 2022 @08:40AM (#31738443)
I havent read the article yet but from my understanding the issue of cost of Saturn V wod have been mitigated by scaling up production.

I read a recebt biography about Von Braun and IIRC the entire project was designed to scale up, and all of that was hastily thrown away for the ineffective shuttle program.

Re:Just another Apollo? Part two (2005) by Gravityloss on Tuesday June 14, 2022 @09:06AM (#31738817)
One problem about technology development is scaling too early.

The transistor, integrated circuit, surface mounted component robotic pick and place machine, laser and fiber optics. In the software world, countless of ideas. Open source too. Whole generations of software developers. All those were needed for the information age, not just throwing money to scale up Sage or Sabre or VAX or anything.

Re:Just another Apollo? Part two (2005) by jmyeet on Tuesday June 14, 2022 @10:07AM (#31739726)
This is a pattern you see a lot in sechnology. Often the second version of something significantly learsnf rom the first. Take something like C#, which really corrected a lot of the problems Java had.

A more physical example is the rail network in the US. It's often asked "why don't we have high speed rail in the US?" Being a nation of autophiles obviously doesn't help but it's not as simple as putting higher speed trains on existing track. It's not even as simple as replacing the existing track with track that can take a higher speed train.

The rail network we had is an artifact of the performance constraints of 19th century trains for the most part. Top speed is the most visible constraint. But the grading, turning angles, etc are all a function of much lower constraint on top speed.

We'd probably be better off if we had no national rail network at all, which is pretty much the situation China was in. Admittedly there are other factors in China's rapid HSR deployments (eg streamlining planning and acquisition of land).

But I digress. Timing is hugely important in scaling.

Re:Just another Apollo? Part two (2005) by nradov on Tuesday June 14, 2022 @02:00PM (#31743360)
The US low speed rail network works pretty well for freight. Despite some occasional bottlenecks and delays, it's still superior in certain ways to rail freight in China and the EU.

As for HSR, do we really need it? It might make sense in the northeast corridor but it's hard to make a business case elsewhere. The California HSR project has turned into the usual government megaproject boondoggle with long delays and cost overruns. Even if it actually gets built I'll probably never ride on it.

Re:Just another Apollo? Part two (2005) by gedy on Tuesday June 14, 2022 @10:32AM (#31740117)
This is very true, and also reminds me of our telephone system, or Japan - which someone described as "living in a futuristic version of the 1990s".
Re:Just another Apollo? Part two (2005) by frxx on Tuesday June 14, 2022 @01:55PM (#31743285)
Most accurate description of living in Japan I've read!
Re:Just another Apollo? Part two (2005) by dr_dshiv on Tuesday June 14, 2022 @11:26AM (#31740880)
Yeah, but if we had just kept investing in faxtech innovation, it might have turned out pretty awesome. Just saying.
Re:Just another Apollo? Part two (2005) by Gravityloss on Tuesday June 14, 2022 @09:10AM (#31738883)
In rocketry one big needed technology before scale up can happen is reuse. Probably also intact abort and other technologies.

One should look at the operational capacity, not the theoretical capacity. Who cares if you have an airplane that can theoretically do Mach 3 if it's being repaired in the hangar and you need it now? In airplane lingo a plane like that is called a "Hangar Queen"

Falcon 9 is a huge step in the operational direction. But more is needed. Can one do two flights in 24 hours? Can one save the second stage too? Just the fairing? Or can one make the second stage cheaper? Or salvage it in orbit?

Re:Just another Apollo? Part two (2005) by wolverine876 on Tuesday June 14, 2022 @10:03AM (#31739657)
> In rocketry one big needed technology before scale up can happen is reuse.

There are other ways to reduce cost, such as cheaper rockets, more efficient fuels, etc. Whatever SpaceX does isn't the only possibility or a necessity.

Re:Just another Apollo? Part two (2005) by Gravityloss on Tuesday June 14, 2022 @03:50PM (#31745094)
Those also help, certainly.
Re:Just another Apollo? Part two (2005) by mmmeff on Tuesday June 14, 2022 @09:34AM (#31739218)
This is why newer space startups like Stoke are aiming to produce totally reusable second stages. The goal is commercial airline-like refuel and relaunch.
Re:Just another Apollo? Part two (2005) by giantrobot on Tuesday June 14, 2022 @09:50AM (#31739505)
The Shuttle was amazingly effective. It succeeded in most of its original mission objectives. It conducted hundreds of scientific missions, launched and repaired Hubble, and built the ISS (originally Freedom).

The "cost" of Shuttle launches was calculated as NASA's entire manned spaceflight budget divided by the number of scheduled launches. They paid salaried staff all year no matter how many launches happened. That cost was trending downward as the number of launches increased prior to the Challenger disaster. After return to flight after Challenger NASA cut the launch schedule but had to pay the same infrastructure costs so Shuttle flights got more "expensive".