TFL used to have its own generating stations, which helped keep costs manageable and also meant the trains kept running during power cuts.
That ended around 2000. Now it has at least four separate connections to the National Grid, and is supposed to be moving to 100% renewables within the next decade.
[1] https://content.tfl.gov.uk/fc-20171205-part-1-item08-tfl-ene...
In fact, the level of effort required to estimate electricity uses for multiple franchises on one physical section of railway has resulted in nearly all British rolling stock having built-in electricity metering.
The new ones are much better, although they still recover very little braking energy.
That Is Insane!!
Rail needs a complete rethink of design from the ground up. There are certainly vast efficiencies from rolling steel wheels on steel rails. But I've seen little evidence of light-weighting and indeed active resistance to steps like making cars using composites, which would save enormous amounts of energy and cost over the lifetime, as well as reduce maintenance costs. Yet their approach to everything seems to be sticking with an approach of 'brute force and ignorance'. Sure that works in the 19th century when you're just starting to put some carbon in iron and make it stronger than pig iron, but materials are sooo far past that now, yet it's still the same old approach. (&yes, I strongly support the Chesterton's Fence checking but this seems way beyond that)
But anyway, the affected trains are the oldest in use in Britain, from 1972 (Bakerloo Line, 36 trains) and 1973 (Piccadilly Line, 87 trains), out of 620 passenger trains across the whole system. New trains have been ordered and should be introduced in 2025.
There's been a 10 year delay, due in part to the 1990s attempt to privatize chunks of the system.
https://www.cressall.com/applications/rail-traction-dynamic-...
(scroll down to "MOTOR STARTING AND SPEED CONTROL RESISTORS")
Whenever possible regenerative braking is used. In this case the drive motors convert the kinetic energy of the train into electricity, which is fed back into the power supply and used elsewhere on the network.
If it cannot be absorbed by the system the energy may have to be dissipated with braking resistors. These braking resistors can be either mounted on the rail vehicle or as a fixed (trackside) installation connected to the third rail or overhead catenary via Automatic Assured Receptivity Unit (AARU) systems.
Perhaps not coincidentally, the inefficiency also has a massive carbon and budget impact... Or it would, if the train system had to pay for the electricity it used - which it doesn't! Trains in the UK are given free unmetered electricity, so there is no reason to conserve energy. Hot tunnels are just an extreme symptom of that.
If they had to pay for usage, at todays wholesale electricity rates, it would cost nearly a billion pounds a year. Which is ~20% of their revenue! I can see why they don't want to pay that bill!