I use a similar set:
- Time between idea first recorded and idea in production.
- Time between idea merged to main branch and idea in production (in some places this is negligible, in others where ideas spend most of their time hanging out -- done, but collecting dust).
- Time actively spent on task over the time between work started on idea and idea merged to main branch. (This is "flow efficiency" in lean terminology.)
Other than that I use the DORA metrics too. I measure defect rate by looking at proportion of merge requests that fix defects, because mostly that is a stable distribution.
- Time between idea first recorded and idea in production.
- Time between idea merged to main branch and idea in production (in some places this is negligible, in others where ideas spend most of their time hanging out -- done, but collecting dust).
- Time actively spent on task over the time between work started on idea and idea merged to main branch. (This is "flow efficiency" in lean terminology.)
Other than that I use the DORA metrics too. I measure defect rate by looking at proportion of merge requests that fix defects, because mostly that is a stable distribution.