This guy is a "yard master" - the air traffic controller of the rail industry.
1. Railroads are focused on "units per train" - increasing the length of the trains.
- They're running long trains that are 10k+ feet long, but we have many old RR yards from WWII era that only fit 3k ft long trains. Takes 3 hours to put these trains together exiting the yard and no other trains can use the yard during that time.
- Something I didn't understand that causes train cars to derail on bridges
- Some trains are longer than the range of the 2 way radios that conductors typically use. There's a procedure that involves a conductor inspecting the train as it goes by, and apparently they can't always contact the train.
2. Consolidation of terminals.
- Some regional stations for inspecting coal trains closed down. I didn't understand this explanation either.
- Moving yard masters to a central location and having them run the yard with cameras. Has resulted in peoples' deaths
3. Workload on people. Yard masters work 16h/day 365 days/year.
4. Management metrics reducing headcount + extra engines / equipment leads to lack of redundancy
Two things he'd ask for:
- Max 8k ft length of a train
- Disincentivize any reason to store a locomotive
That would be true in a non-monopolistic situation, but it's well known from the investor side that what the railroads are doing around rates is driven by collusion and lack of regulation.
CSX stock was at $8 in 2016 and is at ~$33.50 now. There is no amount of throughput increase that could drive those financial results. You could lever up your cap structure with tons of debt (even 6-7x) and not even get close to this kind of return on equity.
Throughput doesn't matter when you have pricing power; in fact, abrupt drops in throughput make people even more desperate so that they can raise the freight rates even more.
There were a lot of systems in place to monitor rolling stock:
- Wheel Impact Detectors
- Hotbox detectors
- Acoustic bearing detectors
- Truck performance detectors
To name just a few. There were also efforts to monitor the railway infrastructure. The things I remember:
- Rail stress management (rails need to be under the right amount of stress, which of course varies with temperature)
- Top of rail friction management
- Rail profile management (the name eludes me, but the idea is you want the interface between the rail and wheel to meet certain parameters)
I worked on the rolling stock side measuring wheel impacts, overloads, imbalances, and a handful of more esoteric metrics. One of the outputs of these measurements was a train consist. For each of our locations we were able to build up the consist of the entire train (which was a fun CS problem in itself).
I stared at a lot of consists over the years. In North America I never saw anything longer than about 100 cars and 2-4 locos. However, in Northwest Australia they routinely ran 300 car trains meeting the description in this article. But, the reason they could get away with that is they were running a straight shot from the heart of the Pilbara to one of the port towns on the north west shoulder (Karratha and Port Hedland).
I need to check in with my old colleagues and see if things have changed. It wouldn't surprise me if train lengths have gotten longer, but I would be surprised if this correlated with a large increase in derailments, as that would have a tremendous impact on average network speed and thus profit.
As someone mentioned elsewhere on this thread, there are a lot of single track corridors. It's bad enough when one train has to sidetrack. It's really bad when a train takes out the whole corridor. These aren't packet switched networks. It's not easy to reroute. And it's really expensive and difficult to lay new rail.