Re:How Crossrail was affected by the curvature of the Earth ... by ArchitectAnon on Thursday May 05, 2022 @11:32AM (#31274645)
Also Kansai airport [0] had to cope with this issue, complicated by the fact that it's built on reclaimed land and the whole thing is (or was) on software controlled hydraulic jacks which control differential settlement.

[0] http://www.rpbw.com/project/kansai-international-airport-ter...

[1] http://engineering-timelines.com/scripts/engineeringItem.asp...

Re:How Crossrail was affected by the curvature of the Earth ... by boredumb on Thursday May 05, 2022 @12:19PM (#31275277)
Extremely interesting and an amazing feat of engineering.

"The terminal was completed in less than 36 months." Blows me away the most I think.