Meanwhile, a set of 5 30-year-old diesel-electric railroad locomotives can reliably put out ~10MW of usable electrical power (vs. thermal production). Vastly cheaper, with a proven track record and 100% duty cycle. (Generously figuring 3 running, 1 standby, 1 down for maintenance.)
( Wikipedia reference on JET: https://en.wikipedia.org/wiki/Fusion_power#1990s )
After 1997, the only way to scale up was reactor size, and that started with ITER, the 20-story-tall reactor in France. That soaked up a lot of fusion money, has been slow to build, and it's still not running. But more recently REBCO hit the market, and the same scaling laws say a reactor smaller than JET using those should get substantial energy gain. Two projects are building such reactors, and at least one will be ready around 2025.
(In any case, I wouldn't say five diesel locomotives are comparable to "burning a few tiny lumps of coal.")
https://www.mpg.de/18250857/jet-fusion-facility-new-world-en...
The plasma was stable and they could have gone longer except instead of superconductors, JET uses copper coils that would melt if they went longer.
Their input energy was about three times their total output. But fusion output scales with the square of reactor volume and the fourth power of magnetic field strength, and modern REBCO superconductors can support much stronger fields than JET was using.