Re:Crossrail update on the Elizabeth line’s opening plans
by Reason077 on Sunday March 27, 2022 @07:22PM
(#30825181)
Only the self-contained Paddington to Abbey Wood core section will be part of the initial opening.
Trains from Stratford will still be terminating at the same high-level platforms at Liverpool Street. Through running into the core tunnels (and thus a signalling system change) will come later.
Trains from Stratford will still be terminating at the same high-level platforms at Liverpool Street. Through running into the core tunnels (and thus a signalling system change) will come later.