> In case of PtG applications, electrolyzer utilization becomes a key parameter. To illustrate the resulting utilization of electrolyzers when run on “surplus” electricity alone it is helpful to plot the residual load duration curves for different penetration levels of intermittent renewables.21Figure 11.4 depicts two typical residual load duration curves for a 30% and 80% share of generation from intermittent renewables of total electricity demand.
“High electrolyzer utilization reduces the specific share of electrolyzer capital costs in hydrogen production costs; on the other hand, a higher utilization increases electricity costs, as hours of expensive electricity will increasingly be included. Hence, in order to minimize hydrogen costs, electrolyzer utilization has to be balanced with the electricity price.”
Of course the specific utilization percentage varies based on how expensive the equipment, it’s overall efficiency, and grid spot prices. We don’t actually know how expensive it is at scale so picking exact percentages is impossible.
However, the grid is expected to have a lot of unused capacity. California is already at the point where 5% of all solar power produced is wasted and people are still constantly adding solar because the current economic break even is ~50% of all solar produced being wasted. That would average around 4-5 hours a day of basically “free” electricity which isn’t quite enough, but at scale at scale electrolysis equipment is almost that cheap and will probably hit that point.
This becomes more likely when you consider efficiency as a useful tradeoff. 40% efficiency at 2c/kWh or 20% efficiency at 1c/kWh potentially spend the same amount on electricity per kg of hydrogen but the second is likely much cheaper to build. You could potentially have several designs that get turned on or off depending on the current spot price.
This analysis is 5 years old and it was already the case back then: https://www.sciencedirect.com/topics/engineering/hydrogen-pr...