Re:EU drafts plan to label gas and nuclear investments as green by pydry on Sunday January 02, 2022 @10:39AM (#29769542)
>We need 1200 wind turbines to replace an 30year old nuclear power plant. Windturbine = 3mW, Nuclear power plant = 1.2GW

Hornsea two provides as much as a nuclear plant, with vastly lower cost and built about 15x faster. It's 165 x 8 MW turbines.

It was planned, executed, built and brought online before Hinkley point C even laid the first brick at ~45% of the cost and a load factor of about 65% (to nuclears 80) due to the greater reliability of wind with large turbines.

>mineral mining for the Solar panels

You mean going to the beach?