News for hackers. Stuff that matters.
Re:EU drafts plan to label gas and nuclear investments as green by ben_w on Sunday January 02, 2022 @05:41AM (#29767595)
The facilities don’t yet exist in large numbers because batteries have only recently become cheap enough to do this cost effectively.

Even the battery factories are in their early stages right now.

Do you have a reference for the storage capacity of that NSW battery? Because every newspaper I’ve found talking about it, only talks about megawatts (power) not megawatt-hours (energy), and it’s the latter which is expensive for batteries, not the former.

Re:EU drafts plan to label gas and nuclear investments as green by kwhitefoot on Sunday January 02, 2022 @07:27AM (#29768179)
I don't know how big the New South Wales battery is but Victoria has just switched on on:

"The 300 MW / 450 MWh battery will consist of 210 Tesla Megapacks covering an area smaller than the football oval at Geelong’s GMHBA Stadium"

https://victorianbigbattery.com.au/