Re:Northvolt assembles first lithium-ion battery cell at Swe...
by magicalhippo on Thursday December 30, 2021 @06:57AM
(#29736011)
We have a similar issue in Norway. There's currently a huge difference in prices between north and south of Norway due to limited transport capability. It's been over 10x at times this winter[1], though on average "just" 3-4x.
In addition the water reserves for our hydro, which is like over 90% of our power generation, is quite low...
[1]: https://www.nordpoolgroup.com/Market-data1/Dayahead/Area-Pri... (December 21, Oslo vs Tromsø)
Re:Northvolt assembles first lithium-ion battery cell at Swe...
by cormacrelf on Thursday December 30, 2021 @06:07AM
(#29735709)
Yeah. Everyone's got the same problems; practically nobody has invested enough in transmission. (I'm hoping someone sees this and corrects me, I'd love to see a good example.) Good luck up there.
Re:Northvolt assembles first lithium-ion battery cell at Swe...
by fulafel on Thursday December 30, 2021 @08:10AM
(#29736417)
What is preventing fixes to transmission, isn't it straightforward engineering with predictable construction times that can be planned well in advance?
Re:Northvolt assembles first lithium-ion battery cell at Swe...
by tmikaeld on Thursday December 30, 2021 @10:24AM
(#29737440)
It is very much fixable, but the Swedish ruling party don't want to do the recommended upgrades, even though they themselves commissioned the investigations into the infrastructure..
There's not only a production issue, but also a transport issue.