“Over two days, MOS and Cyan engineers sketched out a 6502-based console design by Meyer and Milner's specifications. Financial models showed that even at $25, the 6502 would be too expensive, and Peddle offered them a planned 6507 microprocessor, a cost-reduced version of the 6502, and MOS's RIOT chip for input/output. Cyan and MOS negotiated the 6507 and RIOT chips at $12 a pair“
“Over two days, MOS and Cyan engineers sketched out a 6502-based console design by Meyer and Milner's specifications. Financial models showed that even at $25, the 6502 would be too expensive, and Peddle offered them a planned 6507 microprocessor, a cost-reduced version of the 6502, and MOS's RIOT chip for input/output. Cyan and MOS negotiated the 6507 and RIOT chips at $12 a pair“