Re:Plan Ahead for Phase Out of 3G Cellular Networks and Service
by darksaints on Friday December 10, 2021 @10:58PM
(#29518282)
The FR2 hardware requires phased array antennaes for beamforming capability. While it technically could be used without beamforming, it would be extremely inefficient and have even less range than their already limited range. And those MIMO phased array antennaes are crazy expensive...it's still a technology with several active patent encumbrances.
As far as the size, all of the units we sold have been approximately the same size for quite a while. E.g. all the chasses varied by maybe 6-10" max between the old assemblies and the new. The new ones were larger (maybe more room for power electronics?) I don't know if there was any effort on our part to support 5G transition without replacing our antennas.
Edit: I believe we were pushing new hardware because the services wanted to utilize the high frequency band of FR2 24-56Gz [1] (what I meant by "true 5G") that our old antenna assemblies couldn't support. I assume they couldn't support it because they weren't optimized for those bands at a high enough fidelity for good data transmission.
[1] https://en.wikipedia.org/wiki/5G#Frequency_range_2_(24%E2%80...