Re:China to supercharge uranium race with 150 new nuclear re...
by ben_w on Monday November 08, 2021 @05:14PM
(#29154962)
28 trillion? A 3000 km long by 1m^2 cross section solid aluminium conductor would only cost 22-ish billion, and that lets you put the PV in Gobi desert with minimal losses.
But overproduction and diversity of the type of renewable is probably even cheaper.
But overproduction and diversity of the type of renewable is probably even cheaper.