Nuclear plants that are on time and on budget are exceptions, not the rule.
Basically, in his description this is entirely due to the environmental movement. Any time a nuclear plant gets planned the green groups move in a mountain of lawyers and lock down the process for years and years. The costs this adds to the projects are staggering and it is solely because of this that nuclear power can't be built in the US. In Europe, people have no problem building nuclear cheaply and on time.
Not true, unfortunately. The same political dynamics that made nuclear expensive in the U.S. eventually made it expensive in Japan, France and, mostly recently South Korea. None of those countries, which were global leaders during their respective nuclear industry booms, can build nuclear nearly as cheaply as they used to; certainly not domestically, and not even internationally as the absence of continuous construction meant loss of skilled labor and project management expertise. See, e.g., https://www.vox.com/2016/2/29/11132930/nuclear-power-costs-u... (Google other more recent articles that better detail the current state for South Korea.)
Very much no.
https://en.wikipedia.org/wiki/Olkiluoto_Nuclear_Power_Plant#...
"The main contractor, Areva, is building the unit for a fixed price of €3 billion, so in principle, any construction costs above that price fall on Areva." [...] "The total cost of the project, therefore, is estimated to be €11 billion."
Since it's hard for me to track the scandals surrounding Areva and the different ownership structures of it, involving EDF, Framatome, TVO and who-knows-what-else, take this with a grain of salt, but I think the cost overruns may ultimately have to be paid by French tax payers?
"The construction of the unit began in 2005. The start of commercial operation was planned for 2010,[19] but has been pushed back several times.[20] As of August 2020, the estimate for start of regular production is June 2022.[21]"
https://en.wikipedia.org/wiki/Flamanville_Nuclear_Power_Plan...
"EDF estimated the cost at €3.3 billion[4] and stated it would start commercial operations in 2012, after construction lasting 54 months.[5] The latest cost estimate (July 2020) is at €19.1 billion, with commissioning planned tentatively at the end of 2022.[6][2]"
And there were also problems with the EPR reactor containment vessel EDF/Areva/Framatome delivered to China.
This is all from the foremost "experts" at fission plant production in France.
To my knowledge, only China has successfully (that we know) built new reactors lately.
https://edition.cnn.com/2021/07/31/asia/taishan-nuclear-plan...
If you have a plan to fix the regulatory environment in a way that makes it cheaper than fossil fuels (ignoring long term hidden costs of fossil fuel use), then by all means advocate for that. I just think that we shouldn't assume that the technical, economic, and political hurdles will be overcome. Wind and solar are the cheapest option we have right now, so I think that's what we should plan to use. If another better option becomes available we can use it too. I just don't think we should put our eggs in the "nuclear will save us" basket. Maybe it could, but maybe it won't and we need a plan B.
https://tradingeconomics.com/commodity/coal
We are also producing more coal than ever before (modulo the dip during covid lockdowns), and coal use is projected to increase:
"Global coal production is expected to grow at a compound annual growth rate (CAGR) of 2.3% between 2021 and 2025 to reach 8.8 billion t in 2025. While thermal coal production is expected to have a relatively marginal 2% CAGR to reach 7549.6 million t, metallurgical coal is forecast to register stronger growth of 4.2% per year, to reach 1216.9 million t in 2025."[1]
Of course coal purchasers would prefer a lower price, but the fact that the price is high is proof that there is great demand for coal. This does not mean that there is not demand for renewables, either. Both the usage of renewables and the usage of coal is predicted to increase.
See https://www.eia.gov/todayinenergy/detail.php?id=49976
Increases in coal-fired generation in Other non-OECD Asia—which includes Indonesia, Vietnam, and Thailand, among other countries—will account for over 75% of our projected increase in global coal-fired generation from 2030 to 2050. For Other non-OECD Asia, we project that renewable energy sources will account for about 60% of the generation increase over the projection period, primarily from wind and solar. Coal-fired generation will account for nearly all of the remaining growth.
I don't mean to be hostile, I'm just saying that as far as I understand it, nuclear is expensive which means that people who are looking to get the most power for the least cost probably are going to go with wind and solar. If we can somehow make nuclear cost competitive then that's great but I don't know what's needed for that to happen and in the mean time I think the sensible thing is to treat nuclear as something that might work, but we aren't counting on it.