Re:The race to grab all the UK’s lithium before it’s too late
by Tagbert on Monday October 18, 2021 @10:21AM
(#28905683)
Most recent estimates are that under typical electrical grid power sources, it takes 8,000 miles to pay off the manufacturing CO2 debt for an EV, not 30,000 miles. I believe that larger figure is if you’re grid were 100% powered by coal.
Re:The race to grab all the UK’s lithium before it’s too late
by jfklsdfjsdf on Monday October 18, 2021 @10:32AM
(#28905800)
That would be the most optimistic estimate I've ever seen - do you have a source for it?
Assuming 73kg/CO2e per kWh of EV pack[1], an 85kWh EV pack, an ICE that gets 40mpg (and thus 40 miles per 11kg CO2), grid production of 0.30kg CO2e / kWh (which is far lower than the US grid output), and 3 miles per kWh for the EV, the breakeven point is at 35,000 miles.
[1] https://www.transportenvironment.org/wp-content/uploads/2021...
More fun calculations include "how many solar panels would we need to power one Gigafactory" and "how many wind turbines would we need to manufacture that many solar panels".