Re:Nuclear Power in France
by _ph_ on Tuesday October 12, 2021 @01:48PM
(#28842715)
Maybe I have not made that point clear enough in my post: currently they are failing to build replacement plants at a cost at which they could replace all of the existing reactors. Unless they can come up with an entirely new design which considerably cuts cost compared to what is considered a "current design" right now, there will be a reduction in capacity.
[ Parent
| on HN ]
Re:Nuclear Power in France
by concordDance on Tuesday October 12, 2021 @03:06PM
(#28843760)
Nuclear being staggeringly overregulated is the reason for the high costs. If we put the same price on lives lost to car accidents as we do to lives lost in nuclear accidents (which some basic back of envelope calculations using old reactor construction costs and lives lost in nuclear accidents reveals to be well over a billion dollars per life) none of us would drive.
If you consider the possible extend of a major accident - whole southern Germany could become contaminated and tens of million of people could loose their homestead - a certain emphasis on safety is welcome.
Building them in series tends to make per-unit cost come down.
Re:Nuclear Power in France
by it_citizen on Tuesday October 12, 2021 @05:15PM
(#28845176)
Surprisingly, experience has shown that building more nuclear plants, even standardized, don't make them cheaper to build but more expensive.
2010: https://www.sciencedirect.com/science/article/abs/pii/S03014...
2020: https://arstechnica.com/science/2020/11/why-are-nuclear-plan...
In the 2020 article two of the 3 reasons listed are changes, regulation and design changes. So it's not really series-production of a single model.