Scrum avoids the eighteen-month waterfall death marches that kill a department or a company. Scrum gets you thinking in terms of managing scope, of pacing deliverables, of thinking of a list of prioritized "wants" as you say rather than a dictated set of commitments. Scrum makes you approach development as it has to actually happen in the real world, rather than as a dictated plan that inevitably won't survive contact with adversity.
Of course it's completely possible to still mess that up, with overzealous adherence to process and ceremony and metrics. It's very possible to run Scrum as a set of perpetual two-week waterfalls -- and very possible that that's still a great improvement over two-year waterfalls.
Having said that, I'm glad Scrum worked for you.
I remember when Scrum came out. It's a very specific method for a very specific company type that was sold to work with any company. Before scrum, each company kinda figured out their own processes based on their size, team composition, output requirements, and their risk tolerance. Ticket systems existed before scrum, feedback loops existed before scrum, bug tracking existed before scrum, prioritization existed before scrum. Scrum just took all the things that already existed and put them in a very specific and somewhat restrictive process. It was eye candy for the execs who had no idea how their department worked, it was a cash cow for the consultants selling it. It's ok if you don't have anything else or you're dealing with high turnover or something like that, but if you have a mature department already, it's probably more restrictive than not.