Grid operators will balance variable supply with variable demand, and storage will grow as battery costs come down as manufacturing for battery cells scales up to meet EV demands.
I can call Tesla today and have a Megapack installed in a few months. Same for solar and wind utility scale installs. If I break ground on a nuclear reactor today, it will be at least a decade before you see the first kilowatt generated. Georgia's Vogtle units 3 and 4 nuclear generators are six years behind schedule and costs have ballooned to almost $10 billion [2]. $10B buys a lot of renewables and batteries.
[1] https://upload.wikimedia.org/wikipedia/commons/thumb/f/f4/NE...
[2] https://en.wikipedia.org/wiki/Vogtle_Electric_Generating_Pla...
"you really think it'll be cheaper to lay power cables under the atlantic ocean" -- TremendousJudge