Rural Wales for 3.5 years? 30 minutes of downtime total, ~99.998% uptime. Similar total downtime in Cambridge, but I was there 8.5 years, so 99.9993% uptime. I don’t think it’s ever failed me here in Berlin.
That in particular is why I’m saying here that American infrastructure looks bad. It’s not the only way, TBH, but it is so in a new and relevant way I wasn’t previously expecting.
I could be wrong, but I suspect that the infrastructure in the two places is built essentially the same way. I think the crucial difference is that Connecticut has so many more trees. Downed trees break the lines all over the state whenever a windstorm or a snowstorm comes through. (Come to think of it, most of the UK doesn't get snowstorms, either).
I'm just saying that never for a second would I consider trading any of those trees for additional uptime. Nor do I want to pay the utility providers whatever it would cost to bury all those lines in the ground where they'd be safer from storm damage. I'd rather have a week without power every couple of years.
I'd be curious to know if the story is different in rural or semirural Scandinavia.
I don't think of the infrastructure here as _bad_, though.
We do have the occasional outage after a storm, as I described. But, even if the uptime were as low as 99%, which it is not, I would not want to pay the cost of making the grid significantly more resilient than it is.