Yes, the law is very clear about a lot of things, but what happens in reality is often not so clear always.
Permits for modifications in extant buildings can be also hard to obtain if the area is historical and buildings are singular, old or protected for some reason. Specially if you want to mess with the load that the structure must stand. Out of this areas there is often a 'permit free' period in Abril-May for doing small repairs and repainting.
You "can build in the middle of a dry riverbed" (if nobody is watching) is not the same as "you will be allowed to repair" when your house will be flooded six years later. (And it will happen, because this place was called 'las ramblas' for something).
The real state promoter wants your money, not your friendship, so using the services of a professional consultant can save you a lot of future headaches.