Availability has nothing to do with what you are talking about (it’s much higher for photovoltaics anyway). Out of the 49.5% non-renewables only gas which makes up 12.5 percent of electricity can really be used to follow demand. Coal and nuclear are too slow for that.
https://en.wikipedia.org/wiki/Availability_factor
https://en.wikipedia.org/wiki/Peaking_power_plant
https://www.ise.fraunhofer.de/de/presse-und-medien/news/2020...
Modern nuclear plants can do load following and they do so in France and in Germany. So why is "nuclear too slow"?
Intermittency is mostly relevant for 100% zero carbon energy which is a goal that is incredibly far away. At least another 10 years before we even think about it and then another 10 years to do it.
I suspect Germany does the same thing, but it would be interesting to hear if my guess is correct.
Sweden is also currently investing heavily in connecting power lines with nearby countries in order to increase the capacity to buy energy with countries that produce energy through fossil fuels when needed.
What do you define as 'a total disaster'? Coal fuel consumption is down enormously, supplanted by renewables and a tiny bit of gas generation growth.
Germany's CO2 intensity of electricity isn't actually very good. It's worse than the UK, and 7 times more than France.
Likewise, CO2 reductions aren't very large, and is still above average for EU member states: https://www.eea.europa.eu/data-and-maps/daviz/co2-emission-i...