Planned maintenance in that factory is worked with the power company. I'm not sure if that means they are also doing maintenance on some power plant, or if that means during Christmas lights season.
If you can predict high wind times a week in advance I'll work my energy hungry production around your cheap energy prices. The only thing I need is some sort of guarantee that those times will happen "often enough". I can pay employees to work 60 hour weeks some months, and other months get paid vacation, so long as over a full year I get reasonable use of my factory and there is some prediction.
At the moment pretty much every MWh generated is a substituted MWh not generated by gas and periods of negative pricing are still relatively rare.
Wind is so cheap though, that at some point, overproduction will become the norm rather than exceptional and being able to timeshift your usage could, unexpectedly, end up saving you more money than reducing your usage.
The counterintuitiveness of this and the fact that this is new territory is why I think that there's lots of profit potential.
Space heaters don’t become obsolete, and they’re not very capital intensive, or require much maintenance. You just need space to put them in.
What are you talking about? Just take the three phases from your power outlet and stick them in the ground, with some distance between them. There, zero capital costs, and a nice, mostly resistive load for the power plant. A bad time to be an earthworm, though.
What the fuck?!
It took a bit of persuading to get him to believe me about the smell of burning plastic and suspiciously dry area of pavement just down the road. Once he believed me, a crew came in, dug the thing up, replaced a section of cable, and relaid tarmac, in a surprisingly short time.
https://www.alibaba.com/product-detail/11KV-10MW-Load-Bank-f...
Sometimes power plants have GW size load banks, it's an acre or so of steel wires strung up on poles. All the wires glow red hot when in use. It is quite a sight.
But if you're in a different industry, with equipment that takes a longer to become obsolete or wears out before it becomes obsolete, lower utilisation might be fine. Plenty of capital equipment spends loads of time idle.
Not paying for electricity is profitable by default.. Having a reserve for the long term that's environmentally friendly, its a benefit.. Investing in infrastructure that doesn't depend on finite fossil fuels is profitable.. So I have no idea what you're talking about.
> For the same reason, it's not a good idea to have bitcoin mining equipment sitting around waiting for cheap electricity. The hardware becomes obsolete very quickly, so there's only limited time to earn back the investment.
Its really nothing like that at all..
Then you should also read the sentence directly after the one you quoted, in which it's explained:
> > The equipment that sits around waiting for low or negative electricity prices represents locked up capital, and ongoing maintenance and depreciation costs.
But the costs over time are negligible when current alternatives will eventually only go up due to scarcity. I might be missing something.
In heavy industry, they're very much not. Large machines often cost large amounts of money. You don't want large machines sitting around doing nothing when they could do useful work and earn money instead – so that you can, for example, pay off the loans you took out for them, or pay the operational staff that pulls the levers and turns the switches.
For the same reason, it's not a good idea to have bitcoin mining equipment sitting around waiting for cheap electricity. The hardware becomes obsolete very quickly, so there's only limited time to earn back the investment.