I think you are missing the most important part. Even after Apartheid, the existing utilities provided for the entire population. However, there has not been any new generation capacity since 1994. Instead, the maximum generation capacity has shrunk year on year as boilers and other key parts of the power plants fail and aren't replaced.
Re:Our app was banned because the button says “Report User” ... by igitur on Tuesday March 16, 2021 @01:10AM (#26473256)
> However, there has not been any new generation capacity since 1994.

That's not true. Majuba Power Station was commissioned between 1006 and 2001, although planning started in the Apartheid era. Gourikwa Power Station and Newcastle Cogeneration Plant were commissioned in 2007.

There are a few wind farms built after 2001: Hopefield, Coega, Darling, Klipheuwel, Dassiesklip Wind Energy Facility and Jeffreys Bay.

And solar: Kalkbult, Mulilo Renewable Energy Solar PV Prieska, De Aar Solar PV, Mulilo Renewable Energy Solar PV De Aar, SA Mainstream Renewable Power Droogfontein, Letsatsi Solar Park, Lesedi PV Project, Kathu Solar Energy Facility 1, Sishen Solar Facility and the Jasper Solar Energy Project.

But these were not enough to keep up with the demand.

Re:Our app was banned because the button says “Report User” ... by igitur on Tuesday March 16, 2021 @07:13AM (#26475254)
Majuba Power Station was commissioned between 1996* and 2001
Re:Our app was banned because the button says “Report User” ... by alienthrowaway on Monday March 15, 2021 @09:20PM (#26471731)
I'm not OP - that they explicitly mentioned this:

>> The supply side was woefully mismanaged and didn't nearly keep up with the pace of the growth in demand.