Something "blowing up" is only possible if every possible safety device failed.
Offhand I am not quite sure what the damage from off-nominal frequency operation is though - inductance is jwl - any impedances with a lagging reactive component will vary proportionally with frequency. a decrease in frequency will cause an increase in current. I imagine off-nominal frequency operation causes something to get hot.
I can think of at least a couple potential issues:
* If the grid frequency is lower than the frequency the machine is trying to turn, it's possible for the generator to jump forward and mechanically slam forward to the next pole.
* Some turbines have problems running too far off rated speed. (IIRC, torsional resonance issues.)
Pole slipping, a loss of synchronism, i would associate more with transient events such as large losses of load or generation that cause big changes in power flows as opposed to a sustained operation at 58 Hz. Loss of synchronism or pole Slipping should be protected against by out of step protection elements?
I guess it's also quite hard to regularly test this sort of safety mechanism end to end, so there's surely a fear that it wouldn't work.
My general read on this is that generation can trip off more easily than most kinds of load, so when reserves are low, they need to be more explicitly proactive about taking load offline. That In case a generator trips offline that consumes all the remaining responsiveness and takes the grid to a collapse. I assume what a total collapse looks like is every generator tripping offline in a matter of a few seconds or minutes.
Hopefully, though, there'd be enough ability to disconnect transmission lines to isolate the failure to a specific part of the grid. Back in the 2003 NY blackout, the failure was isolated to the northeast because NJ disconnected its grid. The last couple steps of this timeline are illustrative:
https://en.wikipedia.org/wiki/Northeast_blackout_of_2003#Seq...
* ..,
* 4:11:57 p.m. The Keith-Waterman, Bunce Creek-Scott 230 kV lines and the St. Clair–Lambton #1 230 kV line and #2 345 kV line between Michigan and Ontario fail.
* 4:12:03 p.m. Windsor, Ontario, and surrounding areas drop off the grid.
* 4:12:58 p.m. Northern New Jersey separates its power-grids from New York and the Philadelphia area, causing a cascade of failing secondary generator plants along the New Jersey coast and throughout the inland regions west.
* 4:13 p.m. End of cascading failure. 256 power plants are off-line, 85% of which went offline after the grid separations occurred, most due to the action of automatic protective controls.
I know people that were working at PJM when that happened, and they tell stories of essentially continual announcements on the PA system announcing various emergency states they needed to respond to. Which they did.
> I guess it's also quite hard to regularly test this sort of safety mechanism end to end, so there's surely a fear that it wouldn't work.
Generators trip all the time. In fact, one of my first jobs was working at a TX based utility company analyzing the frequency disturbances that occur when generators trip offline. You can learn a lot about the way the grid responds by looking at the plot of frequency over time right around a trip.
I have literally never seen a large induction machine used as a generator, every machine larger than 300 kW I have seen has been a synchronous machine. If I've read about 600 different power plants, 598 of them have had synchronous machines.
Where in the world, what application, and in what age of installation are engineers choosing induction machines + power electronics over synchronous machines?
There's a discussion of the problems posed by loss of system 'inertia' here:
https://www.drax.com/technology/shock-absorbers-keeping-grid...
https://www.wired.com/story/how-30-lines-of-code-blew-up-27-...
When the power applied to the generator shaft by the turbine is greater than the load placed on the generator by people’s lights and heaters, the turbine and generator speed up until the gas turbine backs off the throttle a bit to balance power out of the turbine in to the generator and power out of the generator.
If people turn on more lights and heaters and power out of the generator is greater than power in, the imbalance is made up from the rotating machinery’s inertia and it slows down. If the imbalance isn’t corrected by opening the throttle on the gas turbine it slows down until it stops rotating.
If the throttle is already wide open and demand exceeds supply the machines slow down until they stop and nobody gets any electricity, so they have to have some blackouts to reduce the load so that demand is not greater than supply.
Nothing should blow up though.